A vessel’s ground tackle is only as reliable as the anchor and chain holding it. At MI Solutions, our onboard team recently completed a full anchor and anchor chain installation at Khorfakkan anchorage, using tug boat support to safely position, align, and connect the new ground tackle before confirming it was fully operational. This article breaks down the installation procedure and the standard our marine mechanical service team applies to every anchor and mooring equipment job.
From pre-installation preparation to final function check and handover, this is what a proper anchor installation looks like when the vessel’s safety at anchor is on the line.
Job Parameters at a Glance
The anchor and anchor chain installation was carried out at Khorfakkan anchorage, delivered end-to-end by MI Solutions’ in-house onboard team:
|
Location: Khorfakkan Anchorage
|
Support: Tug Boat Assisted Operation
|
|
Method: Vessel Crane Positioning & Alignment
|
Result: Anchor Seated & Free-Running Confirmed
|
The Installation Procedure, Phase by Phase
MI Solutions executed the anchor and anchor chain installation in four stages, each managed by our in-house onboard team with one point of contact from mobilisation to handover.
|
Phase 1
Pre-Installation Preparation & MobilisationBefore work began, the hawse pipe, chain locker, and windlass were inspected to confirm readiness to receive the new anchor and chain. Rigging arrangements were reviewed and the vessel’s crane was set up for the lift. A tug boat was mobilised to hold position and provide stable support alongside the vessel at Khorfakkan anchorage throughout the operation. |
|
Phase 2
Anchor & Chain PositioningThe new anchor and chain were lifted and positioned using the vessel’s crane, with the tug boat holding the vessel steady to allow controlled, precise handling throughout the lift. Each length of chain was fed through the hawse pipe and lowered in stages, keeping tension controlled and the anchor correctly oriented for stowage. |
|
Phase 3
Alignment & ConnectionWith the anchor and chain in position, alignment was carefully checked against the hawse pipe and chain locker before the joining shackle was fitted and secured. Each connection point was torqued and pinned to specification, confirming the anchor was correctly seated and the chain properly stowed in the locker. |
|
Phase 4
Function Check & HandoverThe windlass was operated to run the anchor out and walk it back in, confirming the anchor was free to run, correctly seated in the hawse pipe, and that the chain paid out and stowed cleanly with no fouling. Once the function check was complete, the tug boat was released and the job data was documented and handed over to the vessel for the ship’s records. |
|
The Result
Anchor Ready for ServiceThe new anchor and chain were positioned, aligned, and connected without incident, and the function check confirmed the anchor was properly seated and free to run. Delivered with 100% in-house skills, tug boat support, and full documentation handed over to the vessel, this is the standard MI Solutions applies to every anchor and mooring equipment job across Africa and the Middle East. |
Related Services from MI Solutions
Anchor and chain installation frequently sits within a wider mooring and deck equipment servicing scope. MI Solutions provides all of the following under one roof, with one point of contact and no subcontracting delays:
|
Marine Mechanical
Windlass & Mooring Equipment ServicingFrom anchor installation to full windlass overhaul, MI Solutions’ marine mechanical engineers cover windlass servicing, chain locker maintenance, and mooring winch repair. |
|
Marine Hydraulics
Windlass Hydraulic Power Pack RepairWhere a windlass’s hydraulic motor or power pack needs attention alongside an anchor installation, MI Solutions’ marine hydraulic repair team covers actuators, cylinders, and control valves across all major manufacturers. |
|
Welding & Fabrication
Hawse Pipe & Chain Locker Structural RepairWhere an inspection reveals wear or fatigue around the hawse pipe or chain locker, MI Solutions’ welding and fabrication team handles structural steel repair and precision welding to class requirements, onboard or in-house. |
|
LSA & FFA
Davit & Life-Saving Appliance ServicingAnchorage visits are a natural opportunity to combine ground tackle work with LSA servicing. MI Solutions’ life-saving appliance service team covers davit load testing, lifeboat servicing, and release gear inspection to class requirements. |
|
Marine Spare Parts
Anchors, Chain & Mooring Spares, Fast Supply to PortNeed an anchor, chain, shackles, or mooring spares delivered to your vessel? As one of the most reliable marine spare parts suppliers in the UAE, MI Solutions sources and delivers class-approved components direct to port alongside the service team, across Africa and the Middle East. |
Need Anchor or Mooring Work Done? Contact MI Solutions
|